See our results for yourself.

Ballarat Demolition Commercial – Church Demolition Heritage Facade.

Suburb

Ballarat

Size

2700m2

Timeline

18 Days

The Ballarat Commercial Demolition project commenced in central Ballarat, is an exciting work for Bayside to play a part in.

The future build will be located within walking distance to the GOV Hub, less than 300m to Ballarat Hospital and Medical Center, and a short walk from the Ballarat Art Gallery and the Ballarat Rail Station.

The works also allow us to participate in retaining some of Ballarat’s red brick Charm. A heritage facade has been placed over the former church. Find out more about Ballarat’s great heritage retention efforts.

 

Project Details

Spring Creek – House Demolition Torquay.

Suburb

Torquay

Size

120 m2

Timeline

9 days

Bayside Demolition completed the work backing up to Spring Creek with steep access and hazardous materials.

Project Details

Gilbert st Torquay – Fire Damage Demolition.

Suburb

Torquay

Size

690m2

Timeline

21 Days

Bayside has completed fire damage demolition works in Gilbert st Torquay.

The fire damaged multiple tenancies, with some walls being able to be retained and propped.

There was no asbestos on the site. However, working in a high-traffic area required traffic management and high-level dust suppression.

 

 

 

Project Details

Brewery Commercial Demolition Geelong.

Suburb

Geelong

Size

2400m2

Timeline

5 weeks

A former brewery with a large complexity from large production lines. The Brewery was purchased by a developer looking to clear all buildings on the site and develop smaller industrial spaces and offices.

Project Details

Brunswick House Demolition.

Suburb

Brunswick

Size

145m2

Timeline

5 days

House Demolition completed in Brunswick Brunswick House Demolition Bayside Demolition has recently completed a House demolition for GDM group in Brunswick.

Project Details